Part Release Checklist¶
Complete before a part can be ordered, machined, or otherwise fabricated.
Part Number:
Description:
Subsystem:
Quantity (practice + comp + spares): __ + __ + __ = __
Owner (student):
Release Requirements¶
- Part fits in the master-model assembly context — no interferences.
- Drawing exists (required if machined). Format: PDF in
cad/drawings/. - Material specified.
- Tolerances specified where they matter.
- Finish specified (anodize, powder-coat, none).
- Fastener sizes for holes documented.
- Vendor + link OR machining process identified.
- Cost per unit + total known.
- Lead time acceptable relative to CAD Lock schedule.
- Weight recorded in weight sheet.
- Second reviewer walked the part.
Second Reviewer¶
Not the CAD author. Reviewer confirms:
- Dimensions look right.
- Interfaces to mating parts match.
- Manufacturing method is realistic.
Reviewer name: ____ Date: YYYY-MM-DD
Release¶
- Part number assigned.
- Entered in BOM.
- Added to kanban ("CAD Released" column).
Released by: ____ on YYYY-MM-DD.
Rev History¶
| Rev | Date | Change | Author |
|---|---|---|---|
| A | initial release | ||
| B |