Skip to content

Gate Review Record — [Gate Name]

Date: YYYY-MM-DD

Gate: G# (Strategy Approval / Prototype Down-Select / CAD Lock / BOM / Sim Autonomy / Field Readiness / Event Departure)

Scope: (e.g., "Intake subsystem CAD Lock")

Duration: __ min

Attendees

  • Student Lead:
  • Second Signer (mentor or student):
  • Others present:

Artifacts Reviewed

Attach or link:

  • Artifact 1
  • Artifact 2

Rubric Walkthrough

Each rubric item from 07_gate_reviews.md for this gate:

# Criterion Result Notes
1 Pass / Fail
2 Pass / Fail

Decision

  • Pass
  • Conditional Pass (blockers below, deadline: YYYY-MM-DD)
  • Fail (rework required, next gate: YYYY-MM-DD)

Conditional Pass Blockers

  1. Blocker — owner — deadline.

Sign-offs

  • Student Lead: ____ (name / date)
  • Mentor: ____ (name / date)

Action Items

# Action Owner Due
1

Comments