Gate Review Record — [Gate Name]¶
Date: YYYY-MM-DD
Gate: G# (Strategy Approval / Prototype Down-Select / CAD Lock / BOM / Sim Autonomy / Field Readiness / Event Departure)
Scope: (e.g., "Intake subsystem CAD Lock")
Duration: __ min
Attendees¶
- Student Lead:
- Second Signer (mentor or student):
- Others present:
Artifacts Reviewed¶
Attach or link:
- Artifact 1
- Artifact 2
- …
Rubric Walkthrough¶
Each rubric item from 07_gate_reviews.md for this gate:
| # | Criterion | Result | Notes |
|---|---|---|---|
| 1 | Pass / Fail | ||
| 2 | Pass / Fail |
Decision¶
- Pass
- Conditional Pass (blockers below, deadline: YYYY-MM-DD)
- Fail (rework required, next gate: YYYY-MM-DD)
Conditional Pass Blockers¶
- Blocker — owner — deadline.
- …
Sign-offs¶
- Student Lead: ____ (name / date)
- Mentor: ____ (name / date)
Action Items¶
| # | Action | Owner | Due |
|---|---|---|---|
| 1 |